Skip to main content
City of Fayetteville
File #: 24-3917    Version: 1 Name:
Type: Consent Status: Agenda Ready
File created: 3/14/2024 In control: City Council Regular Meeting
On agenda: 3/25/2024 Final action: 10/15/2025
Title: PWC - Bid Recommendation - Re-Advertisement of Water Main Replacement from Robeson Street to Winslow
Attachments: 1. Bid Recommendation - Readvertisement of Water Main Replacement from Robeson to Winslow
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

TO:                                            Mayor and Members of City Council

THRU:                      Timothy L. Bryant, CEO/General Manager

                                          Fayetteville Public Works Commission

 

FROM:                     Fayetteville Public Works Commission

 

DATE:                      March 25, 2024

 

RE:

Title

PWC - Bid Recommendation - Re-Advertisement of Water Main Replacement from Robeson Street to Winslow                     

end

 

COUNCIL DISTRICT(S):                      

Council District(s)

All                     

 

 

b

Relationship To Strategic Plan:

High Quality Built Environment

 

 

Executive Summary:

Bids were received for the Re-Advertisement of Water Main Replacement from Robeson Street to Winslow.  The lowest responsive, responsible bidder is T. A. Loving, dba Pipeline Utilities, Inc., Goldsboro, NC, in the total amount of $910,229.00.     

 

 

Background: 

The Fayetteville Public Works Commission, during their meeting on March 13, 2024, approved the bid recommendation to award the Re-Advertisement of Water Main Replacement from Robeson Street to Winslow to T. A. Loving Company, dba Pipeline Utilities, Inc., Goldsboro, NC, the lowest responsive, responsible bidder, in the total amount of $910,229.00.  The Commission also approved to forward this recommendation to City Council for approval

 

BIDDERS                                                                                                                                                                                             TOTAL PRICE

 

T. A. Loving Company, dba Pipeline Utilities, Inc., Goldsboro, NC                     $   910,229.00

Sandford Contractors, Inc., Lemon Springs, NC                                                                                    $1,191,190.00

  

 

 

Issues/Analysis: 

This project consists of installation of approximately six hundred seventy (670) linear feet of twelve (12) inch water main along an existing easement between Robeson Street and Winslow Street, including approximately one hundred fifty (150) linear feet of main and casing installed by jack and bore to cross under railroad tracks; testing and connection to the existing water system; abandonment of the existing ten (10) inch water main; and all other necessary items to complete the work.

 

Notice of the bid was advertised through PWC’s normal channels on November 6, 2023, with an initial bid opening date of December 14, 2023. The solicitation was readvertised on December 18, 2023, due to the minimum number of bids received being below the General Statute requirement. The readvertisement bid opening date was set to Wednesday, January 10, 2024. Bids were solicited from three (3) bidders. PWC received two (2) bids for this project. The two (2) bids received were then evaluated by the Water Resources Engineering and Procurement departments. 

 

MWDBE/Local Participation:  T.A. Loving Company dba Pipeline Utilities, Inc., Goldsboro, NC is not a local or MWDBE business. T.A. Loving Company dba Pipeline Utilities, Inc. anticipates $14,500.00 with MWDBE contractors, such as hauling, fencing, and concrete contractors, and $80,000.00 with local contractors, such as hauling, clearing, erosion control, and material suppliers 

   

 

 

Budget Impact: 

 

This project will be bond funded.

 

 

Options

N/A

 

 

Recommended Action: 

The Fayetteville Public Works Commission recommends the Fayetteville City Council approve the bid recommendation to award the contract for the Re-Advertisement of Water Main Replacement from Robeson Street to Winslow to T. A. Loving Company, dba Pipeline Utilities, Inc., Goldsboro, NC, in the total amount of $910,229.00, the lowest responsive, responsible bidder.  The City Council authorizes the CEO and General Manager of the Fayetteville Public Works Commission to execute for that purpose the contract for its construction. 

 

 

 