TO: Mayor and Members of City Council
THRU: Adam Lindsay, Assistant City Manager
FROM: Sheila Thomas-Ambat, Public Services Director
Byron Reeves, Assistant Public Services Director - Engineering
DATE: October 23, 2023
RE:
Title
Bid Recommendation - Neville Street Drainage Improvements
end
COUNCIL DISTRICT(S):
Council District(s)|109|
b
Relationship To Strategic Plan:
High Quality Built Environment
Executive Summary:
The Council is asked to approve award of, and authorize the execution of a contract for the Neville Street Drainage Improvement project. The lowest responsive, responsible bidder, ES&J Enterprises, Inc. is recommended.
Contract will be funded in part by a FEMA Hazard Mitigation Grant awarded to the City under major disaster designation DR-4393.
Background:
The Neville Street Drainage Improvement Project will conduct approximately 2,000 linear feet of storm drainage improvements with approximately 2,100 linear feet of water main replacement, approximately 900 linear feet of sanitary sewer utility replacement, and associated roadway improvements along Neville Street.
The project is an upgrade to the existing storm drain system which consists of small diameter concrete pipe, limited catch basin inlets and asphalt wedge curbing. The existing storm drain system is being removed and upsized to provide more drainage capacity to reduce localized flooding.
The project was advertised to the public and bids were received on October 3, 2023; (3) bids were received and are as follows:
$1,823,989.00 ES&J Enterprises, Inc.
$2,906,049.00 Lanier Construction Co.
$2,803,878.78 Jymco Construction Co.
Issues/Analysis:
FEMA requires adherence to strict procurement and documentation guidelines to qualify for federal reimbursement of expenditures for response and recovery from natural disasters. City staff is making every effort to comply with those requirements to maximize reimbursement from FEMA as appropriate.
Bud...