City of Fayetteville
File #: 19-1172    Version: 1 Name: Award Contract for Sykes Pond Road Bridge Replacement
Type: Consent Status: Agenda Ready
File created: 12/12/2019 In control: City Council Regular Meeting
On agenda: 1/13/2020 Final action:
Title: Award Contract for Sykes Pond Road Bridge Replacement
Attachments: 1. Bid Tab - Sykes Pond Road Bridge Replacement 12062019, 2. Sykes Pond Road
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

TO:                                            Mayor and Members of City Council

THRU:                      Kristoff Bauer, ICMA-CM, Deputy City Manager

 

FROM:                     Sheila Thomas-Ambat, PE, CCM, CFM - Public Services Director

                                          Kimberly Toon, CLGPO, Purchasing Manager

DATE:                      January 13, 2020

 

RE:

Title

Award Contract for Sykes Pond Road Bridge Replacement                      

end

 

COUNCIL DISTRICT(S):                      

Council District(s)

All                     

 

 

b

Relationship To Strategic Plan:

Goal 3:  High Quality Built Environment

Goal 4:  Desirable Place to Live, Work and Recreate

 

 

Executive Summary:

The Council is asked to approve award of and authorize the execution of a contract for Sykes Pond Road Bridge Replacement. The lowest responsive, responsible bidder, Smith Rowe, LLC Mount Airy, NC, is recommended.

 

Background: 

A storm event on September 29, 2016 washed away a culvert and the road embankment on Sykes Pond Road at Little Rockfish Creek.  The extensive damage caused the City to conduct an engineering evaluation on the most appropriate repair.  After a hydrologic and hydraulic analysis was conducted, it was determined the most cost effective alternative would be to place a bridge at this location.

 

This contract will consist of bridge construction, water main construction, roadway reconstruction, storm drainage, and erosion control.  The bridge will consist of a single span box beam bridge for the crossing over Little Rockfish Creek including roadway approach work.  The project will also include an aerial waterline crossing.

 

The project was advertised for bids to be opened on December 03, 2019.

Bids received are as follows:

 

                     $1,147,819.18                     Smith Rowe, LLC, Mount Airy, NC

                     $1,150,588.74                     S&C Construction, LLC Wilmington, NC

                     $1,253,646.50                     Dane Construction, Inc. Mooresville, NC

                     $1,264,140.15                     National Bridge Builders, LLC Kernersville, NC

                     $1,297,000.00                     T.A. Loving Company, Goldsboro, NC

                     $1,357,362.20                     Sloan Construction a Division of Reeves Construction Company, Duncan, SC

                     $1,372,731.00                     FSC II, LLC dba Fred Smith Company, Raleigh, NC

 

 

 

Issues/Analysis: 

None.

 

 

Budget Impact: 

No Budget Impact because funds have been appropriated for this purpose in prior years.  The Public Works Commission (PWC) will pay for their portion of costs associated with the aerial waterline crossing.

 

 

Options

1-Award contract as recommended by staff

2-Not award contract and provide further directions to staff

 

 

Recommended Action: 

Staff recommends Council approve contract award and authorize the City Manager to execute a contract for Sykes Pond Road Bridge Replacement with the lowest, responsive, responsible bidder, Smith Rowe, LLC, Mount Airy, NC in the total amount of $1,147,819.18.

 

Attachments:

                     Bid Tab - Sykes Pond Road Bridge Replacement

                     Map of project location